Housing Disrepair Case Study – Pre-Action Settlement Following Late Response
MJV Solicitors acted for a tenant who brought a housing conditions claim against her housing association landlord arising from prolonged housing disrepair at a three-bedroom Victorian terraced property in London. The claim was pursued under the Pre-Action Protocol for Housing Conditions Claims (England) and settled shortly before court proceedings were issued.
The client had reported disrepair to the landlord over an extended period. Despite repeated complaints, meaningful investigations and repairs were not undertaken within a reasonable timeframe. The landlord’s formal response to the letter of claim was significantly late, and engagement only followed after expert evidence had been obtained.
MJV Solicitors secured £3,586 compensation and the settlement also included confirmation that the repairs identified by an independent expert had been completed, together with an agreement to pay her reasonable legal costs.
Defective Windows, Mould and Leak Damage Affect the Property
The defects complained of were extensive and affected multiple areas of the property. They included disrepair to bedroom and bathroom windows, with perished and brittle rubber seals, defective window catches, and windows that were difficult or unsafe to operate. These defects allowed draughts, moisture penetration and condensation.
There was disrepair to kitchen cupboards, including damaged hinges and doors that were loose or binding. The kitchen ceiling had suffered significant damage following a historic leak from the bathroom above. Sections of plasterboard had collapsed, with visible moisture staining, efflorescence and evidence of wet rot affecting structural timbers. Although the source of the leak had eventually been addressed, the internal damage was left unrepaired.
Further defects were identified by the expert, including a defective kitchen extractor fan, mould-contaminated sealant, a defective pressure relief valve and radiator valve, trapped condensation within double-glazed units, widespread black mould to window frames and walls, defective bathroom flooring and fittings, and issues with the front door locking mechanism. These defects contributed to poor internal conditions, excess moisture and ventilation failures.
For related information, please read: How Does Housing Disrepair Affect Your Health and What Can You Do?
Repeated Reports Fail to Secure Timely Repairs
The claim was advanced on the basis that the landlord had been on notice of the defects and had failed to carry out effective repairs within a reasonable time. Reliance was placed on statutory repairing obligations, fitness for human habitation duties, and the principles set out in O’Brien v Robinson concerning notice.
The letter of claim set out the history of disrepair, the health and safety risks posed to the tenant, and the impact on her day-to-day living, including distress, inconvenience and loss of amenity. The claim was funded under a Conditional Fee Agreement and pursued in compliance with the Pre-Action Protocol, alleging breaches of:
- Section 11 Landlord and Tenant Act 1985
- Sections 9A and 10 Landlord and Tenant Act 1985 (Homes (Fitness for Human Habitation))
- Section 4 Defective Premises Act 1972
- Common law duties
The Letter of Claim set out the history of notice, the defects affecting the property, the health and safety risks created by damp and mould, and sought disclosure together with expert evidence.
The housing association’s formal response was significantly late. We continued preparing the claim and obtaining the evidence needed to establish the condition of the property and the repairs required.
For related information, please read: What Happens If My Landlord Won’t Do Repairs? Your Rights Explained.
Independent Inspection Identifies Further Defects and Required Repairs
Given the landlord’s lack of engagement, an independent housing conditions expert was instructed. The expert inspected the property and produced a detailed report and Scott Schedule. The expert concluded that the landlord had failed to comply with its repairing obligations and identified a comprehensive schedule of remedial works required to address the defects.
The expert confirmed that the defects were consistent with prolonged lack of maintenance and that the property did not meet the standard of fitness for human habitation. Estimated costs for remedial works were provided, together with professional commentary on causation and responsibility.
For related information, please read: How to Gather Evidence for a Housing Disrepair Claim and What Makes a Property Unfit for Human Habitation?
Housing Association Makes a Settlement Offer Before Proceedings Are Issued
Despite the landlord’s failure to respond within the timescales set out in the Protocol, the claim progressed to the stage where expert evidence was complete, and proceedings were imminent. Shortly thereafter, the landlord made a Part 36 offer to settle the claim.
The parties reached a settlement before MJV Solicitors needed to issue the claim at court. This brought the dispute to a conclusion following the landlord’s delayed response and the preparation of the expert evidence.
The Outcome for Our Client: £3,586 Compensation and Repairs Confirmed Completed
The matter settled without the need to issue court proceedings. The settlement provided for:
- Payment of £3,586 in compensation to the tenant, inclusive of general and special damages
- Confirmation that the disrepair works identified in the Scott Schedule had been completed
- Payment of the tenant’s reasonable legal costs on the standard basis
The settlement brought the claim to a conclusion and avoided the need for litigation, although only after significant delay on the part of the landlord.
Why This Housing Disrepair Case Matters
This case demonstrates that housing associations may face substantial liability where they fail to respond to housing conditions claims in a timely and constructive manner. It also highlights the importance of expert evidence in progressing claims and applying pressure where landlords do not comply with the Pre-Action Protocol.
Housing Disrepair Solicitors for Housing Association Tenants
MJV Solicitors regularly act for tenants in housing disrepair claims that resolve both before and after proceedings are issued. The firm has extensive experience in cases involving damp and mould, defective windows, historic leaks, ventilation failures and uninhabitable living conditions, and in securing compensation and repairs even where landlords respond late or seek to delay resolution.
Get in Touch Now for a Free Case Assessment
- Call us on 01253 858231
- Visit our website for more information about how to start your claim for Housing Disrepair
Read about some of our other successful disrepair claims, and how we helped:
- Tenant Secures Compensation After Years of Rat Infestation, Damp and Drainage Problems
- Housing Association Leak Claim – How Mediation Secured a Long-Term Solution
- Council Found in Contempt of Court After Failing to Complete Housing Disrepair Works Ordered by the Court
- Tenant Wins £3,000 After Local Authority Ignores Court Proceedings
- Tenant Wins £4,500 Compensation After Decade of Damp, Leaks and Failed Repairs
- Long-Term Leak Resolved with Compensation and Repairs
- Family Wins £10,500 Compensation After Years of Damp, Mould and Failed Repairs
Useful Guides for Tenants:
- How Much is a Housing Disrepair Claim Worth in England?
- Why Damp and Mould Claims Are Increasing in England
- Damp and Mould in Social Housing: Who is Responsible?
- What is Housing Disrepair? A Guide for Council and Housing Association Tenants
- How to Gather Evidence for a Housing Disrepair Claim
- How Does Housing Disrepair Affect Your Health and What Can You Do?
- What Makes a Property Unfit for Human Habitation?
Frequently Asked Questions
You may have a claim if your housing association has failed to meet its repairing or fitness obligations. The position will depend on the defects, the terms of your tenancy, what the landlord knew and the steps it took in response. MJV Solicitors can assess the evidence and explain whether a claim may be appropriate.
Yes. A settlement can address the effects of earlier disrepair as well as the repairs themselves. In this case, the agreement included £3,586 compensation and confirmation that the scheduled works had been completed. Whether compensation is available in another case depends on the landlord’s obligations, the evidence and the circumstances.
An independent inspection can help establish which defects are present, their causes and the work required to address them. In this case, the expert’s report and itemised schedule documented the outstanding problems and supported the claim as court proceedings approached.
A claim can settle before court proceedings are issued. In this case, the housing association made a formal settlement offer after the expert evidence had been obtained, and the matter concluded before proceedings began. If an agreement cannot be reached, court action may need to be considered.